Project execution
Bottled Water Filling Line Installation and Commissioning
Installation and commissioning should be planned before shipment. The buyer should prepare workshop layout, utilities, drainage, operators and packaging materials for line testing.
01
Treatment
02
Blowing
03
Air Conveyor
04
Rinsing
05
Filling
06
Capping
07
Labeling
08
Packing
Before Installation
Preparation reduces delays after equipment arrival.
- Confirm equipment layout and installation positions.
- Prepare power, water, compressed air and drainage.
- Arrange bottle samples, caps, labels, film or cartons for trial running.
- Prepare operators and maintenance staff for training.
Commissioning Checks
Commissioning should verify each machine and the complete line flow.
Checkpoints
| Bottle conveying | Bottle transfer, guide rail adjustment and buffer behavior |
|---|---|
| Rinsing filling capping | Rinse action, fill level, cap feeding and cap tightness |
| Labeling and coding | Label position, code clarity and reject handling if included |
| Packing | Pack format, film or carton feeding and finished pack discharge |
Internal links
Related Procurement Pages
FAQ
Bottled Water Filling Line FAQ
What materials are needed for commissioning?
Prepare bottles, caps, labels, packing materials, treated water and trained operators before commissioning.
Why should layout be confirmed before shipment?
Layout affects conveyor length, installation sequence, utility positions and operator access.