Check a bottled water filling line offer from bottle and product-water input to finished-pack removal. Record which functions are included, optional, retained or excluded, and who owns the connections between them. This checklist turns a machine list into a supply-boundary record that procurement and engineering can review together.
Give Every Required Function a Scope Status and an Owner
Use the equipment guide to understand the functions. In this checklist, assign a status to each line item. A required function remains required even when its machine is excluded from the supplier offer.
Give Every Required Function a Scope Status and an Owner - Planning Table
| Status | Meaning in the comparison | Evidence to request |
|---|---|---|
| Included | Supplied within the stated base amount and boundary. | Quantity, duty, accessories and connection limits. |
| Optional | Separately offered, not automatically part of the base. | Function, price basis, utilities, layout effect and decision deadline. |
| Retained | An existing site machine or service is intended to perform the function. | Condition, format-specific duty, interface survey and modification owner. |
| Excluded / local supply | Outside this supplier scope; may still be essential for production. | Named provider, budget allowance, interface and readiness requirement. |
| Unresolved | The proposal does not establish the status. | A written clarification before commercial comparison or order release. |
Walk the Process From Water and Bottles to Finished Packs
For each row, record the offer reference, status, quantity and owner. Treat the list as a review framework: the selected product, package and existing plant determine which new equipment is needed.
Walk the Process From Water and Bottles to Finished Packs - Planning Table
| Function | Items to identify | Common boundary question |
|---|---|---|
| Product-water supply | Treatment if required, storage, pump, pipe connection and cleaning boundary. | Who delivers the required water conditions to the filler connection? |
| Bottle supply | Purchased-bottle feeding or blower, preforms, molds, transfer and support utilities. | Are air generation/treatment and cooling included when blowing is selected? |
| Rinse, fill and cap | Monoblock, cap supply, approved formats, handling parts and product connection. | Are the cap feeder and all launch-format parts itemized? |
| Bottle conveying and accumulation | Routes, supports, guides, drives, transfer interfaces and control signals. | Does the allowance refer to the same layout revision and usable buffer duty? |
| Label, code and inspect | Chosen application method, coder, drying if required and defined inspection/reject scope. | Which heat, adhesive, air or consumable items remain outside the base? |
| Pack and remove finished goods | Collation, packer or defined manual interface, discharge and pallet handling boundary. | Where does supplier responsibility end, and who clears the saleable packs? |
Inspect the Items Between the Main Machines
Broad terms such as complete line do not assign all integration work. Ask for a connection schedule that names both endpoints, the work required and who verifies the result.
Inspect the Items Between the Main Machines - Planning Table
| Interface | Scope to check | Acceptance evidence |
|---|---|---|
| Mechanical transfer | Conveyor height, guides, change parts, supports and site modifications. | Approved format runs without unagreed manual intervention at the transfer. |
| Controls | Starved/blocked states, start/stop coordination and agreed fault handshakes. | Witnessed operating sequences and recorded unresolved exceptions. |
| Utility connection | Machine connection versus local distribution and generation. | Required conditions available at the defined point during agreed operation. |
| Installation work | Unloading, positioning, anchoring where required, wiring, piping and trial materials. | Named work owners and a documented site-readiness checklist. |
Separate Change Parts, Wear Spares and Handover Documents
A spare-parts package does not establish that a second bottle format can run. List format tooling separately from service stock. Ask the offer to identify what is delivered at handover and what must be ordered later.
- Change parts: format ID, machine, part reference, quantity and setup responsibility.
- Wear spares: part identifier, supported machine, quantity and recommendation basis; no universal stock quantity is implied.
- Documentation: agreed manuals, electrical/pneumatic drawings, parts lists, settings backups and required language.
- Training and acceptance: tasks covered, participants, test materials, output count point and issue-closure responsibilities.
Normalize Offers Before Comparing Their Totals
These are illustrative offer differences, not actual supplier quotations. Add required missing scope using real amounts, and leave unknown costs unresolved instead of assigning zero. Use the comparison sheet for the financial record.
Normalize Offers Before Comparing Their Totals - Planning Table
| Difference | Clarification or adjustment | Why totals are not yet comparable |
|---|---|---|
| One offer reuses the current packer | Verify sustained duty, format compatibility and modification cost. | Reuse is not a saving until the retained function is shown to work. |
| One offer covers one bottle; another covers two | Identify second-format parts, settings and acceptance work. | The offered production scope differs even if headline BPH matches. |
| One offer excludes bottle supply utilities | Obtain the supporting air/cooling scope and connections. | A blower price alone does not establish an operational bottle source. |
| One offer has an unspecified conveyor allowance | Tie routes, interfaces and buffer duty to a named drawing. | The final arrangement can change both cost and performance. |
Close the Equipment Scope With a Line-Item Record
Keep one row per item with: reference, function, machine or interface, quantity, format/output basis, status, owner, offer revision and open action. Reconcile it with the layout record before requesting the itemized configuration.
- Check that every necessary function has an operating solution, even when excluded from the equipment price.
- Check that optional items have not been counted as base inclusions.
- Ask the supplier to return a revised list with exceptions clearly marked and the same RFQ revision.
- Keep unresolved items visible until the responsible party provides the agreed evidence.
Buyer questions
Questions Buyers Ask Before Quotation
Does complete line mean treatment and bottle blowing are included?
Not automatically. The offer must name its starting point and included machines. Treatment, blowing and their utilities may be new, retained, optional or excluded; each required function still needs an owner.
How should conveyors appear in the equipment checklist?
Identify the type, route or drawing basis, transfers, supports, drives, guides, usable accumulation duty and control interfaces. An undefined length allowance is not a complete integration specification.
Are bottle change parts part of the spare-parts package?
Do not assume so. Change parts enable named bottle or pack formats; wear spares support maintenance. Ask for separate part references, quantities and machine/format mapping.
How do I record an existing labeler or packer?
Mark it retained, document condition and format-specific sustained duty, and name the owner of modifications and control connections. Include the equipment in whole-line tests rather than treating it as a proven interface by default.
What if a required item is missing from every offer?
Add it to the clarification register and assign a supply owner. Obtain its scope, interface and cost before treating the quotation total as a complete operating project. An unpriced requirement is not a zero-cost item.
Request a Line Item List With Clear Supply Boundaries
Send your launch bottle, target capacity and country. Identify existing machines so Allot Tech can distinguish new equipment, retained functions, options and exclusions in the quotation.