Water Multipack Shrink Film Holes Near Bottle Caps

Find whether the damage exists before the tunnel or appears during shrink and later handling. Map hole locations to cap geometry and bundle position. Distinguish puncture, seam failure and excessive local shrink; a thicker film or a hotter tunnel is not a universal cure.

Stage
Position
Material

Direct answer

Why does shrink film tear or develop holes around the caps of a water bundle?

Find whether the damage exists before the tunnel or appears during shrink and later handling. Map hole locations to cap geometry and bundle position. Distinguish puncture, seam failure and excessive local shrink; a thicker film or a hotter tunnel is not a universal cure.

Stage
Inspect before and after the tunnel.
Position
Map holes to caps and bundle edges.
Material
Control film specification and lot.
Trial
Verify pack handling as well as appearance.

Preserve the damage-location pattern

Photograph identified packs before opening or handling them further. Mark bottle position, cap contact, seam and machine orientation. Compare pre-tunnel film condition with exit samples and later handling samples. Retain film lot, bundle format and approved machine settings. A final damaged pack alone cannot determine when the hole was created.

Match the first damage to its interface

Film-hole investigation

First appearance Compare Review
Before tunnel Film path and contact marks Cutting, sealing or mechanical damage
At cap contact after shrink Cap geometry and hole position Package/film application compatibility
Only bundle edges Pattern and position-specific exposure Bundle formation and tunnel review
After downstream handling Transfer and storage observations Finished-pack handling

Validate the complete pack after an approved change

  • Trial one authorized material or setting change with traceable film and bottle lots. Preserve before/after evidence.
  • Verify pack integrity, carrying/handling method and bottle stability under agreed conditions; cosmetic improvement alone is insufficient.
  • Qualified personnel should follow safe tunnel and film-path procedures. This guide does not specify film gauge, shrink energy or an acceptable hole size.

Request a packer trial around real closure samples

Send Allot Tech filled bottles with the actual closure, film construction, pack pattern, output and defect map. Ask for included format parts, material restrictions and a representative finished-pack trial. Compare corrective offers by the demonstrated damage mechanism, not a blanket promise that thicker film will remove every failure.

Planning sources and verification boundary

FAQ

Questions Buyers Ask Before Quotation

Will thicker film always stop holes near caps?

No. Confirm the damage stage and contact pattern; material changes do not automatically correct mechanical or application faults.

Should I increase heat to make the film tighter?

Use the supplier's approved trial method and verify film integrity and bottle stability together.

Why are only corner bottles affected?

Map bundle position, contact and exposure rather than assuming all positions experience the same conditions.