Allot Tech

Wetin bottled water filling line quotation really include?

Two suppliers fit quote the same BPH but cover different work. One offer fit stop after filling and capping; another fit include label and packing. No choose with total price alone. First write the bottled water product wey you need, then mark who go supply and connect each required function. Complete line no replace written equipment and service scope.

Use one project basis for both offers

Give both suppliers the same bottle sizes and neck drawing, cap, water type, required good output, label and pack. State whether you buy empty bottles or need blowing, and whether treatment already dey available. Ask where supply starts and ends, which conveyors and change parts dey included, and who handles utilities and site connections. Same BPH without the same bottle and pack no be equal comparison.

  • Keep quotation revision, equipment list and layout together. If one changes, review the other documents.
  • Separate launch requirements from future expansion. A cheaper offer wey no cover required launch work still get open scope.

Give each row one clear status

Blank cell no mean included. Ask for quantity and responsibility in writing. Supply, connection and verification fit get different owners; machine name alone no settle all three.

Give each row one clear status

Status Evidence wey you need
Included Written quantity, duty and boundary in the current offer
Option Selection, price and effect on launch production
Buyer-supplied or excluded Named supply and connection owner with confirmed scope
Provisional or unanswered Wetin never confirm, who go answer and closing document

Unknown cost no be zero

Keep confirmed supplier amounts, separately quoted buyer work, provisional allowances and unresolved items apart. Show known subtotal with open rows beside am; no call am complete budget. For bundled price, ask the scope instead of inventing machine prices. Use one currency and comparison basis, and state where freight, local work and services enter so nothing miss or count twice. This na procurement review, no be legal interpretation or exact-price promise.

Send a clarification wey supplier fit answer

For each open row, send required function, offer reference, proposed owner, connection, price status and evidence needed. Include your bottle, target output, country, workshop layout and existing equipment. Ask Allot Tech for a configuration and quotation with included, optional and buyer-supplied work separated. If input never confirm, mark am open and agree the next check; no invent a specification to finish the form.

Why bottled water filling line no dey reach the BPH wey dem quote?

BPH mean bottles per hour. The number for filling-machine plate no be the same thing as sealed and packed bottles wey you fit sell. Before you ask for faster machine, measure where bottles dey wait and how many good bottles reach the end of your agreed supply scope. Use your own bottle, cap, label and pack for the check.

Why bottled water caps dey leak after capping?

A wet bottle no automatically mean cap seal don fail: rinse water fit remain outside. First locate where water dey escape with the plant's approved package test. Hold affected product under the quality procedure and keep identified passing and failing samples. No increase capper torque just because leak dey show.

Why water dey short for first bottles after filler start again?

If na only the first bottles after stop look low, no turn every filling head up. For still water inside PET bottle, water level wey eye see no be the same thing as the quantity inside. Measure am first, then find whether na the filler, water supply or inspection side need attention.

FAQ

Questions wey buyers dey ask

Complete line mean every project cost dey included?

No. Ask for actual machines, services, start and end points, utilities and site-work responsibilities. The name alone no settle scope.

Optional packing machine count as included?

No, not until selection, scope and price confirm am. If launch needs packed bottles, keep the function open until somebody covers am.

I fit put zero for cost wey supplier never answer?

No. Keep am unresolved and ask for scope and price. Unknown cost no be the same as written no-charge work.

Ask for quote

For each open row, send required function, offer reference, proposed owner, connection, price status and evidence needed. Include your bottle, target output, country, workshop layout and existing equipment. Ask Allot Tech for a configuration and quotation with included, optional and buyer-supplied work separated. If input never confirm, mark am open and agree the next check; no invent a specification to finish the form.

Di online quote form dey English for now. You fit also send di project details for dis page by email; make we agree di language for follow-up.

Ask for quote
WA: +86 186 6213 1120Quote